Fast DC top-ups for e-auto and bike fleets, with two outputs per unit. Built, networked and supported by Massive Charging.

Get Your Fleet Sized and Quoted in 24 Hours

Tell us your vehicle models, site city and shift pattern. Configuration and price back to you within 24 hours.

Every minute a vehicle sits on a charger is a minute it is not earning. Our 12kW Type-6 DC charger delivers up to 12kW of DC power across two outputs, so one unit tops up two vehicles and your bays turn over faster. We size it to your vehicles and your site, install it, and run it on the same software we use for our own network.

Why fleets choose it

  • Fast DC top-ups between shifts. Type 6 is a dedicated DC fast-charge connector, and the unit delivers up to 12kW in total.
  • Two outputs, one unit. Serve two bays from a single charger and a single supply connection.
  • The connector your vehicles already have. Type 6 (IEC 62196-6 / IS 17017-2-6) is the DC standard adopted by Ola Electric, Tork, Ultraviolette and Simple Energy.
  • Scan, charge, done. Start a session with a QR code or the mobile app. No RFID cards to issue or lose.
  • Stays current. Over-the-air software updates, so the charger improves after it is installed.
  • Easy to install. Wall or pole mount, with a 5 m cable.
  • One vendor, one number to call. We build the charger, run the network software and operate charging stations ourselves.

Not Sure It Fits Your Vehicles?

We confirm compatibility in writing.

Spec snapshot

OutputUp to 12kW DC in total, across 2 outputs
ConnectorType 6 (IEC 62196-6 / IS 17017-2-6)
Vehicle typesBikes and e-autos
Output voltage20V to 120V DC
Input supply3-phase, 50Hz, 400 to 460V AC
MountingWall or pole
Cable5 m
Start and authenticationQR code and mobile app
Software updatesOver the air
ConnectivityGSM, 4G or Wi-Fi
Network protocolOCPP 1.6J
Warranty12 months
Lead time1 month from order

Want the Full Datasheet?

Who it is for

E-auto fleets

Three-wheelers on larger packs, where bay time costs you trips. Get a quote for your fleet →

Hubs and depots with shift turnover

Vehicles come in, top up, and go out again. Book a depot sizing call →

Charging networks adding a Type 6 DC lane

Pair it with network software that handles pricing, payments and reporting. Talk to our network team →

Not for: vehicles with a Type 7 inlet, such as Ather and Hero Vida. A Type 6 charger will not charge them. It also needs a three-phase 400 to 460V supply, so single-phase sites are out. If most of your fleet is small-pack scooters, ask us about the 3kW and 6kW classes instead.

From enquiry to live bay in four steps

  • 1
    Tell us your fleet

    Models, vehicle count, shift pattern, site city.

  • 2
    We size it and quote

    You get a configuration and a price within 24 hours.

  • 3
    Site survey

    We check supply, feeder and layout before you commit.

  • 4
    Install and commission

    Your bay goes live on our network software, with support behind it.

Start with Step 1

Why Massive

We build chargers, we write and run the software that manages them, and we operate charging stations ourselves. When something fails at a bay, we have seen it before. You deal with one company for hardware, software and support, not three.

Reserve your units

Lead time is 1 month from order. Reserve now and you get:

  • A free fleet and site sizing, so you know exactly what to order
  • A written quote within 24 hours

Reserve Your Units

Frequently asked questions

How much does it cost?

It depends on configuration and site. Send us your details and you get a written quote within 24 hours. Request a quote →

Will it work with my vehicles?

If they have a Type 6 inlet, yes. If they have Type 7, no. Send us your model list and we will confirm. Send your list →

What power will my vehicles actually draw?

Each vehicle requests the current its battery can take, so the number is set by the vehicle, not the charger label. The 12kW is the unit's total across its two outputs. We show you the expected figure for each of your models. Ask for the per-vehicle figures →

When can I get units?

Units ship within 1 month of order. Reserve your units →

What supply does it need?

A three-phase, 50Hz, 400 to 460V AC supply. We check yours at the site survey. Request a site survey →

Can my site take it?

We survey supply, feeder and layout before you commit. Request a site survey →

Ready to Size Your Fleet?

Tell us your vehicle models, how many, your shift pattern and your site city. We come back with a configuration and a price within 24 hours.