Open a Massive station in your city.
India's fastest-growing EV charging network is taking franchise applications in 84 Tier-1 and Tier-2 cities. We bring hardware, software, marketing, and the 2.4M drivers already on our app. You bring the land and the ambition.
Franchise ROI · by site size
Nine things in the franchise box.
The complete operator bundle. You bring the land and a site manager. We bring everything else.
Hardware at cost-plus
Chargers from our Pune plant, at our cost plus 6%. Full 3-year warranty and ext. AMC.
- 2× MC-D060 standard
- 1× MC-A22T optional
- Shipped in 4 weeks
Site survey + install
Our civils partner handles foundations, feeder, canopy, signage. One invoice, one timeline.
- Site audit in 5 days
- Install in 4 weeks
- All permits filed
CMS & operator portal
The full Massive CMS. Tariff rules, uptime, settlement, staff logins, white-labelled reports.
- Per-charger P&L
- Tariff rule ships in 2s
- GST-ready invoicing
On the Massive app
Your station live to 2.4M drivers from day one. Featured in your zone for the first 8 weeks.
- Native listing
- Turn-by-turn nav
- Launch push campaign
Launch marketing
Hoardings, WhatsApp, local OEM partnerships, driver coupons. ₹1.5L marketing grant in kind.
- 3 hoardings · 30 days
- Google Maps boost
- OEM driver coupons
24×7 support
Driver helpline in Hindi, English, Marathi, Tamil, Kannada, Telugu. Ops helpline for you.
- <4min response SLA
- On-call engineer in 38 cities
- Spare parts bench
Financing partner
Tie-ups with SBI, ICICI, Tata Capital. Equipment loan up to 75% of BOM. Pre-approved.
- 24–48h approval
- 9–18 month tenures
- Competitive rates
Operator training
3-day residential at our Pune HQ. Your site manager becomes Massive-certified and confident.
- CMS operations
- Driver conflict & safety
- Audit & compliance
Upgrade path
Start with 2 DC guns. Add units as utilisation climbs. Modular site design means no re-civils.
- Add 120kW in 2 weeks
- Add solar canopy later
- Buy-back on fade-outs
Four operator profiles that thrive.
You don't have to come from the EV world — most of our best operators didn't.
Petrol pump owners
You already own the real estate drivers drive to. Add a 2-charger EV canopy in a corner bay. Same staff, new revenue line, same wholesaler workflow.
Real-estate operators
You have parking. Your tenants want EV charging. Our AC bundle is a flagship amenity — and drives 14% more mall dwell time in the first year, per our data.
First-time entrepreneurs
Running an EV charging franchise is a 2026 business — low labour, high tech, measurable. Our Pune training and 24×7 ops means no day-1 learning curve.
Fleet operators expanding
You already charge a 20-vehicle fleet overnight. Open half the site to public drivers during the day — you'll cover your fleet's electricity with public revenue.
Ten weeks · measured.
Apply
Online form, 12 mins. Land proof, PAN, site address.
Site audit
Engineer visit. Feeder capacity, land title, civils feasibility.
Commercials
Tariff, share split, financing. Contract signed.
Build
Civils, feeder, install, commissioning on CMS.
Go live
Soft launch · Massive app listing · marketing push.
140+ franchise sites. Here's what they say.
Weighted sample of franchisees signed in 2024 — six months or more on the network.
"I ran an Indian Oil pump for 22 years. Adding Massive was the easiest growth lever I've ever had. The CMS basically runs itself and my son handles operations in 20 minutes a day."
"We own a mid-sized mall in Coimbatore. We thought EV charging was a nice-to-have. It turned into a genuine traffic driver — and an ₹18L margin line we weren't expecting."
"First-time entrepreneur. I'd never run a business before. The Pune training, the marketing at launch, the 24×7 helpline — I felt like I had a real team behind me from day one."
The eight questions every applicant asks.
Still unsure? Book a 20-minute call with our franchise team — they've onboarded 140+ sites and will give you a straight answer.
Book a call arrow_forwardWhat land size do I need?
How does revenue share work?
Who owns the hardware?
What if utilisation is low?
Can I self-install?
Is FAME-II subsidy applicable?
What's the electricity tariff I'll pay?
Can I sign multiple sites?
The EV wave is landing.
Will your site be on the map?
Applications for 2026 are open in 84 cities. Start with a 12-minute form — we'll reply within two working days.